ENGINE TUNE-UP [MZR-CD (RF Turbo)]
ENGINE TUNE-UP [MZR-CD (RF Turbo)]
id0110f1800600
Engine tune-up preparation
1. Start the engine and warm up completely.
2. Verify that the gear is in neutral position.
3. Verify that the accelerator pedal is released.
4. Turn off the A/C switch.
5. Turn off all electrical loads.
6. Verify that no DTC is present.
7. Connect the WDS or equivalent to the DLC-2.
8. Wait until the electrical fan stops.
Idle Speed Inspection
1. Perform “Engine Tune-up Preparation”. (See Engine tune-up preparation.)
2. Monitor the RPM PID using the WDS or equivalent.
3. Verify that engine speed is within specification.
-
• If not as specified, inspect the following.
-
― Suction control valve
― Fuel injector
― Accelerator position sensor
― ECT sensor
― Fuel pressure sensor
― CMP sensor
― CKP sensor
-
Idle-up speed (rpm)
-
No load: 725—825
A/C switch is on: 725—825
Correction Procedure
Injection amount correction
-
Note
-
• Perform this procedure at the recommended interval as described under “Fuel injection system” in “SCHEDULED MAINTENANCE.”
-
Using WDS or equivalent
-
-
Note
-
• Perform procedure by selecting the corresponding menu on the WDS screen. The procedures appear when “Powertrain” in the “Toolbox tab” is selected.
-
2. Perform “Injection Amount Correction” using the WDS or equivalent.
-
Without using WDS or equivalent
-
1. Start the engine.
2. Repeatedly ground the test terminal 5 times within 5 seconds using a jumper wire.
-
― If the glow indicator light does not illuminate, return to procedure 2.
-
Note
-
• When the fuel injector injection amount correction is completed, the glow indicator light flashes 5 times.