NEUTRAL SWITCH INSPECTION [MZR-CD (RF Turbo)]
NEUTRAL SWITCH INSPECTION [MZR-CD (RF Turbo)]
id0140f1800800
-
Note
-
• Perform the following test only when directed.
Continuity Inspection
1. Disconnect the negative battery cable.
2. Remove the neutral switch. (See NEUTRAL SWITCH REMOVAL/INSTALLATION [A26M-R])
3. Inspect for continuity between the neutral switch terminals using an ohmmeter.
-
• If the neutral switch is okay, perform the "Circuit Open/Short Inspection"
-
• If not as specified, replace the neutral switch. (See NEUTRAL SWITCH REMOVAL/INSTALLATION [A26M-R])
Specification
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION [MZR-CD (RF Turbo)])
2. Inspect for open/short circuit in the following wiring harnesses.
-
• If there is open/short circuit, repair or replace wiring harnesses.
Open circuit
-
• Neutral switch terminal A and PCM terminal 110
-
• Neutral switch terminal B and body ground
Short circuit
-
• Neutral switch terminal A and body ground
-
• Neutral switch terminal A and power supply
-
• Neutral switch terminal B and power supply