INTAKE AIR TEMPERATURE (IAT) SENSOR NO.2 INSPECTION [MZR-CD (RF Turbo)]
INTAKE AIR TEMPERATURE (IAT) SENSOR NO.2 INSPECTION [MZR-CD (RF Turbo)]
id0140f1806200
-
Note
-
• Perform the following test only when directed.
Resistance Inspection
1. Remove the IAT sensor No.2. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZR-CD (RF Turbo)])
2. Place the IAT sensor No.2 in water with a thermometer, and heat the water gradually.
3. Measure the resistance between the IAT sensor No.2 terminals using an ohmmeter.
-
• If not as specified, replace the IAT sensor No.2.
-
• If IAT sensor N0.2 is okay, perform the "Circuit Open/Short Inspection".
Specification
Water temperature (°C {°F})
|
Resistance (kilohm)
|
20 {68}
|
2.21-2.69
|
80 {176}
|
0.29-0.35
|
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION [MZR-CD (RF Turbo)])
2. Inspect for open/short circuit in the following wiring harnesses.
-
• If there is open/short circuit, repair or replace wiring harnesses.

Open circuit
-
• IAT sensor No.2 terminal A and PCM terminal 79
-
• IAT sensor No.2 terminal B and PCM terminal 74
Short circuit
-
• IAT sensor No.2 terminal A and power supply
-
• IAT sensor No.2 terminal A and body ground
-
• IAT sensor No.2 terminal B and power supply