STEP
|
INSPECTION
|
ACTION
|
1
|
VERIFY FREEZE FRAME DATA HAS BEEN RECORDED
• Has FREEZE FRAME DATA been recorded?
|
Yes
|
Go to the next step.
|
No
|
Record the FREEZE FRAME DATA on the repair order, then go to the next step.
|
2
|
VERIFY RELATED REPAIR INFORMATION AVAILABILITY
• Verify related service repair information availability.
• Is any related repair information available?
|
Yes
|
Perform repair or diagnosis according to the available repair information.
• If the vehicle is not repaired, go to the next step.
|
No
|
Go to the next step.
|
3
|
VERIFY CURRENT SIGNAL STATUS: IS CONCERN INTERMITTENT OR CONSTANT?
• Connect the WDS or equivalent to the DLC-2.
• Clear the DTC from the PCM memory using the WDS or equivalent.
• Start the engine.
• Is the same DTC present?
|
Yes
|
Go to the next step.
|
No
|
Intermittent concern exists.
Perform the "INTERMITTENT CONCERN TROUBLESHOOTING".
|
4
|
INSPECT DRIVE BELT CONDITION
• Verify that drive belt auto tensioner indicator mark does not exceed limit.
• Is drive belt normal?
|
Yes
|
Go to the next step.
|
No
|
Replace and/or adjust drive belt, then go to Step 9.
|
5
|
INSPECT GENERATOR TERMINAL FOR POOR INSTALLATION
• Turn the engine switch off.
• Inspect generator terminal B for looseness.
• Is there any malfunction?
|
Yes
|
Connect generator terminal B correctly, then go to Step 9.
|
No
|
Go to the next step.
|
6
|
INSPECT GENERATOR
• Inspect the generator.
• Is there any malfunction?
|
Yes
|
Replace the generator, then go to Step 9.
|
No
|
Go to the next step.
|
7
|
INSPECT GENERATOR CIRCUIT FOR OPEN CIRCUIT
• Inspect for continuity between the following terminal:
-
- Generator terminal D (wiring harness-side) and PCM terminal 9
-
- Generator terminal P (wiring harness-side) and PCM terminal 77
• Are there continuity?
|
Yes
|
Go to the next step.
|
No
|
Repair or replace the wiring harness for open, then go to Step 9.
|
8
|
INSPECT GENERATOR CIRCUIT FOR SHORT TO GROUND
• Inspect for continuity between the following terminal:
-
- Generator terminal D (wiring harness-side) and PCM terminal 9
-
- Generator terminal P (wiring harness-side) and PCM terminal 77
• Are there continuity?
|
Yes
|
Go to the next step.
|
No
|
Repair or replace the wiring harness for short, then go to the next step.
|
9
|
VERIFY TROUBLESHOOTING OF DTC P0562 COMPLETED
• Make sure to reconnect all disconnected connectors.
• Clear the DTC from the PCM memory using the WDS or equivalent.
• Start the engine.
• Is the same DTC present?
|
Yes
|
Replace the PCM, then go to the next step.
|
No
|
Go to the next step.
|
10
|
VERIFY AFTER REPAIR PROCEDURE
• Perform the Repair Verification Drive Mode.
• Are any DTCs present?
|
Yes
|
Go to the applicable DTC inspection.
|
No
|
DTC troubleshooting completed.
|