NEUTRAL SWITCH INSPECTION [L8, LF, L3]
NEUTRAL SWITCH INSPECTION [L8, LF, L3]
id0140a5800800
-
Note
-
• Perform the following inspection only when directed.
Continuity Inspection
1. Disconnect the negative battery cable.
2. Remove the neutral switch. (See MANUAL TRANSAXLE REMOVAL/INSTALLATION [G35M-R].) (See AUTOMATIC TRANSAXLE AND TRANSFER REMOVAL/INSTALLATION [JA5AX-EL].)
3. Inspect for continuity between the neutral switch terminals using an ohmmeter.
-
• If the neutral switch is okay, but CPP/PNP PID value is out of specification, carry out of the "Circuit Open/Short Inspection".
-
• If not as specified, replace the neutral switch.
Specification
Circuit Open/Short Inspection
1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION [L8, LF, L3].)
2. Inspect the following harness for open or short. (Continuity check)
Open circuit
-
• Neutral switch terminal B and PCM terminal 1X
-
• Neutral switch terminal A and body GND
Short circuit
-
• Neutral switch terminal B and body GND