3. Connect a battery charger to the battery and adjust the charging current as follows.
Battery slow charge current
55D23L (60 A·h/20HR): 4.5—5.5 A
75D23L (65 A·h/20HR): 5.0—6.0 A
LN2 (60 A·h/20HR): 5.0—6.0 A
Battery quick charge current [30 min]
55D23L (60 A·h/20HR): 30 A
75D23L (65 A·h/20HR): 35 A
LN2 (60 A·h/20HR): 35 A
4. After the battery is recharged, verify that the voltage is within the specification and remains at the same value for 1 h or more after the recharging has been completed.
• If not within the specification, replace the battery.
Standard voltage
12.4 V or more
Vehicle With i-stop / Without Mazda M Hybrid
Caution
• Do not perform quick recharging. If quick recharging is performed it could result in an i-stop control malfunction.
• After recharging, leave the battery as it is for as long as possible (6 hours or longer recommended) to dissipate the polarization in the battery.
3. To prevent loss of battery fluid during recharging, verify the battery fluid level.
Battery fluid level is halfway between UPPER and LOWER levels or less
• Add distilled water to the upper level.
Battery fluid level is halfway between UPPER and LOWER levels or more
• Go to the next step.
4. Connect a battery recharger to the battery and adjust the charging current as follows.
Constant current recharger device available
1. Apply a constant current charge according to chart 1. Refer to chart 2 for the charging time.
No constant current recharger device available
1. Using a constant voltage battery charger, adjust the voltage so that the recharge current is as indicated in chart 1. Verify the current after 30 s have elapsed since the measurement was started because the current is not stabilized after the voltage adjustment.
2. Charge the battery for 60 min using current in Step (1).
3. Readjust so that the recharge current is as indicated in chart 1.
4. Charge the battery so that the total time for Step (2) is the time in chart 2.
Battery charging procedure (Chart 1)
Battery
Recharge current
Q-85
10-15A
(10.4A if digital setting is possible)
S-95
11-16A
(11.6A if digital setting is possible)
Battery recharge time (Chart 2)
Cell with lowest electrolyte gravity
Charge time (min)
1.24 or more
180
1.23
200
1.22
220
1.21
240
1.20
270
1.19
290
1.18
330
1.17
360
5. Measure electrolyte gravity of all cells.
Cell with lowest electrolyte gravity is less than 1.25
3. Connect a battery charger to the battery and adjust the charging current as follows.
Battery slow charge current
55D23L (60 A·h/20HR): 4.5—5.5 A
75D23L (65 A·h/20HR): 5.0—6.0 A
LN2 (60 A·h/20HR): 5.0—6.0 A
Battery quick charge current [30 min]
55D23L (60 A·h/20HR): 30 A
75D23L (65 A·h/20HR): 35 A
LN2 (60 A·h/20HR): 35 A
4. After the battery is recharged, verify that the voltage is within the specification and remains at the same value for 1 h or more after the recharging has been completed.
• If not within the specification, replace the battery.